G&J Engineering limited were awarded the project of replacing existing 6no. floor mounted Gas fired boilers.

This project was completed within the specified timeframe with minimal disruption to the building staff.

The scope of works included Isolation of existing services, Removal & disposal of existing boilers and flues, Installation of 6no. 110 kw high efficiency stainless steel heat exchanger boilers, Cascade, Circulating pumps, Flues, alterations to existing distribution pipework, Insulation, labelling, testing & commissioning.