G&J Engineering limited were awarded the project of replacing existing 2no. floor mounted Gas fired boilers.

This project was completed within the specified timeframe with minimal disruption to the building staff. These essential works required a contract crane lift to remove the existing Gas boilers & to position the new Gas boilers within a roof plantroom.

The scope of works included Isolation of existing services, Removal & disposal of existing boilers and flues, Removal & disposal of existing 100mm Gas main pipework, Installation of 2no. 400kw high efficiency Rendamax boilers, Circulating pumps, Flues, Spirocross Magnetic strainer, 100mm roof Gas main replacement, alterations to existing distribution pipework, Insulation, labelling, testing & commissioning.