G&J Engineering limited were awarded the project: Refurbishment of bathrooms & bedrooms
This project includes the Installation of Sanitaryware, Tiling, LST Radiators, alterations to LPHW distribution pipework, alteration to HWS/CWS distribution pipework, MWS Break tank, booster pump, Painting & Decorating.
Category: Completed Projects 2021
UCD Innovation lounge
G&J Engineering limited were awarded the project: UCD Innovation lounge science building
The scope of works of this project includes Removal of redundant equipment,
This project includes the Installation of Fan coil units, Ventilation, alterations to LPHW & CHW distribution pipework, alteration to HWS/CWS/MWS/HWSR distribution pipework, Controls, Insulation, Balancing & commissioning
Engineer: CRA

Holy Trinity Church
G&J Engineering limited were awarded the project: Plantroom refurbishment
The scope of works of this project includes Removal of redundant equipment including existing cast iron sectional boiler,
This project includes the Installation of 2no. A rated stainless steel heat exchanger boilers, Cascade, air dirt separator, pressurisation unit, circulating pumps, alterations to LPHW distribution pipework, Gas detection, Controls, MCC Panel, Insulation, Balancing & commissioning
St Paul’s College
G&J Engineering limited were awarded the project Boiler replacement
The scope of works included replacing existing Cast iron sectional boiler, alterations to LPHW distribution pipework, installation of 4no. 150KW stainless steel heat exchanger boilers, Gas pipework alterations, Air dirt separator, Boss X pot, Circulating pumps, Insulation, labelling, Inhibitor Dosing of system, testing & Commissioning.
This project was completed within the specified timeframe with minimal disruption to the building services.
Engineer: Ronan Meally consulting engineers

UCD Yoga
G&J Engineering limited were awarded the project UCD Yoga
The scope of works included alterations to LPHW distribution pipework, installation of Radiators, HWS/CWS distribution pipework, Sanitaryware, Ventilation supply & Extract, Insulation, labelling, testing & Commissioning.
This project was completed within the specified timeframe with minimal disruption to the building services.
Engineer: Ethos engineering

Connolly Hospital
G&J Engineering limited were awarded the project Plantroom 11
The scope of works included replacement of existing twin Circulating pumps throughout plantroom, alterations to LPHW distribution pipework, testing & Commissioning.
This project was completed within the specified timeframe with minimal disruption to the building services.
Bon Secour Hospital
G&J Engineering limited were awarded the project Endoscopy phase 1 & 2
The scope of works included Installation of VRF system, Ventilation supply & Extract, Heater batteries, Sanitaryware, Medical Gases, Soils & Wastes, Alterations to existing HWS, HWSR, CWS pipework, alterations to LPHW distribution pipework, Controls, Insulation, Balancing & commissioning .
Estimated completion of this project is July 2021
Engineer: Homan & O’Brien


Bon Secour Hospital
G&J Engineering limited were awarded the project CSSD
The scope of works included replacement of existing Autoclaves, removal of existing Steam plantroom equipment, Installation of new 2no. Autoclaves, RO plantroom, Boosted CWS distribution pipework, Soils & Wastes, Controls, insulation, labelling, testing & Commissioning.
This project was completed within the specified timeframe with minimal disruption to the building services.
Engineer: Homan & O’Brien