26
Nov
Holy Trinity Church
G&J Engineering limited were awarded the project: Plantroom refurbishment
The scope of works of this project includes Removal of redundant equipment including existing cast iron sectional boiler,
This project includes the Installation of 2no. A rated stainless steel heat exchanger boilers, Cascade, air dirt separator, pressurisation unit, circulating pumps, alterations to LPHW distribution pipework, Gas detection, Controls, MCC Panel, Insulation, Balancing & commissioning