![](https://www.gjengineering.ie/wp-content/uploads/2017/07/aspen-pharma-2013.png)
22
Jul
Aspen Pharma, Citywest, Dublin 22
Aspen Pharma, Citywest, Dublin 22
To reduce costs and increase energy savings, G&J Engineering Limited modified the LPHW system and added heat meters to enable the monitoring of energy use. G&J Engineering Limited completed remedial works carried throughout the water services system.