UCD Student union

This project included Isolation of existing services, Removal & disposal of existing sanitaryware, Installation of LPHW distribution pipework, LST radiators, alterations to existing CWS/HWS/MWS distribution pipework, sanitaryware, Soils & wastes, Insulation, Ventilation, testing & commissioning,  O&M Manual , As built drawings.

Engineer: Ethos engineering

Leave a Reply

Your email address will not be published. Required fields are marked *