
12
Nov
UCD Student union
This project included Isolation of existing services, Removal & disposal of existing sanitaryware, Installation of LPHW distribution pipework, LST radiators, alterations to existing CWS/HWS/MWS distribution pipework, sanitaryware, Soils & wastes, Insulation, Ventilation, testing & commissioning, O&M Manual , As built drawings.
Engineer: Ethos engineering