title image

G&J Engineering limited after a successful tendering process have been appointed main contractor to install the first commercial air source heat pump for heat source at the prestigious UCD Smurfit Business School, Carysfort  Avenue, Blackrock.

As part of UCD ongoing commitment to energy saving this project comprises of retrofitting to an existing building including isolation of the existing heating centre and disposal of existing equipment, Installation of Heating centre, High efficiency air to water heat pump, High efficiency Gas condensing boiler,   LPHW distribution pipework, Gas distribution pipework, Gas detection, twin Circulating pumps, pressurisation unit, 1500 litre Buffer vessel, Heat meter,  water meters, MCC Panel, Electrics, Controls , Builders works, Insulation, testing & commissioning, O&M Manual , As built drawings, system fully integrated and controlled by campus BMS.

 

 Engineer: Powertherm solutions

No Comments

Post A Comment