title image

G&J Engineering limited were awarded the project St Peter’s Church residence plantroom

The scope of works included replacing existing Cast iron boiler, Alterations to existing LPHW distribution pipework, Installation of 3no. 110KW wall mounted high efficiency Gas fired boilers, Magnet deaerator and dirt separator, Variable speed Circulating pumps, Controls, MCC Panel, insulation, labelling, testing & Commissioning.

This project was completed within the specified timeframe with minimal disruption to the building services.

No Comments

Post A Comment