Ongoing Maintenance Projects

Ongoing Maintenance

• Avon Ri lakeshore resort
• Aspen pharmacare
• Bon Secour hospital
• Church of the Annunciation
• Dundrum parochial house
• Finglas Credit union
• Holy Cross Church
• Holy Faith Convent
• Holy Trinity Church
• KCI Medical
• Kish Fish
• Loreto Abbey School
• Multi Denomination School, Griffith barracks & Ranelagh
• Multiple Sclerosis Ireland
• Musgraves Group
• Prosper Fingal
• Rathcoole Commercial VCD Limited
• St Anne’s Golf club
• St Brigid’s School
• St Dominic’s Church
• St Joseph’s Church
• St Olaf’s GAA
• St Paul’s School
• St Paul’s Parochial House
• St Peter’s Church
• St Pius Church
• Siemens healthcare diagnostics
• Tallaght Credit union
• UCD Newman house
• UCD Boat club
• UCD The President Lodge
• UCD Smurfit business school
• UCD Eccles street
• Unitarian Church Dublin
• Vincentian Fathers
• Warrenmount presentation school
• Zurich

UCD Nova Science Block Belfield

Scope of works:

After a successful tendering process G& J engineering Limited were awarded the project UCD Nova located in UCD Belfield Science building

As part of this project G&J Engineering Limited Supplied & Installed new LPHW Distribution pipework, Chilled Pipework, Ceiling mounted Fan coils, Ventilation, MCC Control panel & Controls, Pipework Insulation,  As Built Drawings, O&M Manual, Client demonstration & Commissioning.

47 Eccles Street UCD

After a Successful tendering process G&J engineering  were awarded the project 47 Eccles street,

Scope of works:

As part of this project G&J Engineering Supplied & Installed a new heating centre, Gas distribution, Gas detection, LPHW distribution, MCC Panel &  controls, Radiators, HWS,CWS, MWS distribution & sanitaryware installation

This project was completed within budget and in allocated time frame

 

 

Loreto Abbey, Dalkey, Sports Hall

 

Loreto Abbey Dalkey

Sports Hall

Scope of works:

After a successful tendering process G& J engineering Limited were awarded the project Loreto Abbey new sports hall situated within the picturesque grounds of the prestigious Loreto Abbey Dalkey county Dublin ,

As part of this new build project  G& J engineering Limited Supplied & Installed new LPHW Distribution pipework, HWS,HWSR,CWS,MWS Distribution pipework, Heating Centre, Ventilation, Roof mounted Air Handling units, MCC Control panel & Controls, Pipework Insulation, high efficiency Radiators & the Installation of Sanitaryware throughout.

upon Completion of this project  As installed Drawings & Operational Maintenance Manual were presented to the client.

A full and thorough Commissioning of all services provided & a detailed client demonstration formed part of our handover.

These extensive works were completed  within budget and with no disruption to the School

 

  • Expected completion February 2015

Engineer: KES

 

 

 

Smurfit Business School UCD Block D

After a successful tendering process G&J Engineering Limited have completed a Full refurbishment of building services done in 2 phases complete with new supply, extract & Heat recovery ventilation system, new heating centre including: 2no. 100kw wall mounted stainless steel high efficiency boilers, LPHW circulation Pumps, Pressurisation unit, MCC panel & weather compensation Controls and incorporated into a Building management system, new high efficiency radiators, Air Conditioning, sanitary ware fixtures & HWS,CWS,MWS distribution pipework, sterilisation, Balancing and commissioning

 

Smurfit Business School UCD Granite building

After a successful tendering process G&J Engineering Limited have completed new insulated Trench pipe work from central boiler house to the Historic Granite Building, complete with new temperature controls & LPHW circulation Pumps all incorporated into a Building management system

Consultant Engineers: Powertherm

 

The President Lodge UCD

The President Lodge UCD

G & J Engineering Limited have been successfully awarded the contract after tender process for alterations to the prestigious President Lodge UCD, the contract includes alterations to LPHW system with new motorised Control valves , localised Temperature Stats and Metering for cost efficiency monitoring , a new MCC control panel , two new high efficiency Gas boilers, Cold water booster pump , Cold water storage tank, a new ACV Calorifier and full system Commissioning. All mechanical services will be controlled by a Building Management System .

Consultant Engineer: Brendan Gallagher

 

St Kilian’s Community School

St Kilian’s Community School, Bray, Co.Wicklow

G & J Engineering Limited have been successfully awarded the contract after tender process for alterations to existing cold water storage tank, the contract involves complete Disconnection and removal of existing 36000L cold water storage tank, Installation of a new format 30 potable Cold water storage tank, alterations to CWS and MWS

Consultant Engineer : METEC

 

Loreto College

Loreto College, Foxrock, Dublin 18

Large mechanical installation at Loreto College Foxrock, the services provided included: new LPHW heating system (with both Radiators and Under floor heating), hot and cold water services, rain water harvesting, fan coil units, ventilation services, A/C services, protective services ( to include fire safety appliances), solar hot water and solar panels installation.

Consulting EngineerKeaveny Engineering Services Ltd.

 

 

UCD Smurfit Business College

UCD Smurfit Business College, Carysfort Avenue Co. Dublin

Smurfit Business College UCD Energy upgrade to heating centre, this included the installation of a 600KW modulating gas boiler, invert driven modulating pumps and a new MCC control Panel (incorporating heat and gas meters).

Consulting Engineer – Powertherm Ltd

 

 

UCD Smurfit Business School

In conjunction with the design team lead by Powertherm solutions, G&J Engineering have begun an upgrade to the heating system at the world renowned Smurfit building school. The project includes the installation of a new heating centre and complete boiler house re-fit. The upgrade is of the controls, the mechanical and the electrical installations. We are proud to yet again work with UCD and on such an innovative design. The project was completed in November 2010